<bdo id="713x8"></bdo>

    1. <cite id="713x8"></cite><cite id="713x8"><track id="713x8"></track></cite>
      1. 制服丝袜在线视频,日韩无毛,亚洲色偷偷在线,中文字幕日韩高清一区,精品国偷自产在线视频99 ,久久久综合亚洲色一区二区三区,久久精品国产88久久综合,让少妇高潮无乱码高清在线观看

        CLIMAVENETA

        Projects APPLICATION
        ? Location:Home>Projects
        CLIMAVENETA

        China Construction Bank

        Area:Beijing System Type: Construction Area: Application Type:Data Center Cooling Capacity:62000kW Heating Capacity:

        Project:

        "The data center of China Construction Bank Head Office is located in Daoxiang Lake Production Base, a financial disaster recovery base in Beijing. The project is located in the C6-15 and C6-16 plots of Zhongguancun Innovation Park, Beiqing Road, Haidian District, Beijing, with a total land area of about 136,200 square meters, with a total construction area of about 283,971 square meters. The data room has 2 floors underground and 4 floors above ground, with a building height of 24m. The building category is a multi-storey building. Fire resistance class: first class. Seismic intensity: 9 degrees. The data computer room of this project has 3 data computer room buildings B, C, and D. The construction area of each computer room building is about 46,500 square meters, and the construction area of the computer room building is about 139,600 square meters. There are 4 floors above ground and 2 floors underground. The height is 24 m; there are substations, battery rooms, pump rooms, fan rooms, etc. from the first basement to the second basement, and the module computer room, telecommunication access room, test computer room, network core computer room, etc. on the ground floor to the fourth floor . It is currently the largest financial T4-level data center in China and in Asia, and will undertake the background processing of all financial data of CCB.

        Installed Units:

        48xCSRAT4822-FC-NG-B-Y

        Solution:

        The center is designed by the top IDC experts from HP and China Architectural Design and Research Institute, and the PUE is expected to reach below 1.45. It is also the most advanced and energy-saving green IDC in China. It adopts a large number of the latest international technologies and energy-saving concepts, such as solar energy, air-cooled natural cooling integrated unit, no water consumption design, ice storage design, etc. At the same time, in order to avoid the reliability problem of a single water source, the center design adopts the air-cooled natural cooling technology commonly used in Europe to avoid any water consumption. Guaranteed reliability, truly reaching T4 level. 24 air-cooled chillers with natural cooling (built-in ethylene glycol pump and heat exchanger or external ethylene glycol pump and heat exchanger) are selected for the cold source of the data room, and the supply and return water temperature is 11.5/18°C. A total of 48 large-scale air-cooled natural cooling units are located on the roof and do not occupy the area of ??the computer room. The technical team of Tsinghua University provides professional CFD simulation test data. Make sure there are no thermal effects. The unit provides uninterrupted cold water to continuously supply the data center's computer room air conditioner. Clement's expert team will provide complete life cycle management for the project, and dispatch senior engineering personnel to the site to provide comprehensive technical support for the overall project.

        Certification:

        Projects

        APPLICATION
        Projects

        China Construction Bank

        Area:Beijing System Type: Construction Area: Application Type:Data Center Cooling Capacity:62000kW Heating Capacity:

        Project:

        "The data center of China Construction Bank Head Office is located in Daoxiang Lake Production Base, a financial disaster recovery base in Beijing. The project is located in the C6-15 and C6-16 plots of Zhongguancun Innovation Park, Beiqing Road, Haidian District, Beijing, with a total land area of about 136,200 square meters, with a total construction area of about 283,971 square meters. The data room has 2 floors underground and 4 floors above ground, with a building height of 24m. The building category is a multi-storey building. Fire resistance class: first class. Seismic intensity: 9 degrees. The data computer room of this project has 3 data computer room buildings B, C, and D. The construction area of each computer room building is about 46,500 square meters, and the construction area of the computer room building is about 139,600 square meters. There are 4 floors above ground and 2 floors underground. The height is 24 m; there are substations, battery rooms, pump rooms, fan rooms, etc. from the first basement to the second basement, and the module computer room, telecommunication access room, test computer room, network core computer room, etc. on the ground floor to the fourth floor . It is currently the largest financial T4-level data center in China and in Asia, and will undertake the background processing of all financial data of CCB.

        System Type:

        Installed Units:

        48xCSRAT4822-FC-NG-B-Y

        Solution:

        The center is designed by the top IDC experts from HP and China Architectural Design and Research Institute, and the PUE is expected to reach below 1.45. It is also the most advanced and energy-saving green IDC in China. It adopts a large number of the latest international technologies and energy-saving concepts, such as solar energy, air-cooled natural cooling integrated unit, no water consumption design, ice storage design, etc. At the same time, in order to avoid the reliability problem of a single water source, the center design adopts the air-cooled natural cooling technology commonly used in Europe to avoid any water consumption. Guaranteed reliability, truly reaching T4 level. 24 air-cooled chillers with natural cooling (built-in ethylene glycol pump and heat exchanger or external ethylene glycol pump and heat exchanger) are selected for the cold source of the data room, and the supply and return water temperature is 11.5/18°C. A total of 48 large-scale air-cooled natural cooling units are located on the roof and do not occupy the area of ??the computer room. The technical team of Tsinghua University provides professional CFD simulation test data. Make sure there are no thermal effects. The unit provides uninterrupted cold water to continuously supply the data center's computer room air conditioner. Clement's expert team will provide complete life cycle management for the project, and dispatch senior engineering personnel to the site to provide comprehensive technical support for the overall project.

        Certification:

        主站蜘蛛池模板: 中文字幕久久国产精品| 毛葺葺老太做受视频| 久久午夜无码免费| 亚洲一区亚洲天堂| 夜夜添夜夜添夜夜摸夜夜摸| wwwjizzjizzjizz| 丰满熟女人妻一区二区三| 中文字幕在线视频不卡一区二区| 国产成人无码AV片在线观看不卡| 久久亚洲国产中v天仙www| 最新国产精品拍自在线播放| 亚洲精品国偷拍| 国产人妻精品一二三区| 精品国产三级A在线观看网站| 暖暖 免费 高清 日本 在线| 国产午夜亚洲精品不卡下载| 人妻少妇视频| 蜜桃狠狠色伊人亚洲| 人妻?制服?丝袜| 精品日韩亚洲av无码| 裸体丰满白嫩大尺度尤物| 国产美女被遭强高潮露开双腿| 噜噜噜天天躁狠狠躁夜夜精品| 激情伊人五月天久久综合 | 日韩中文字幕国产精品| 上海集散中心旅游官网订票| 国产精品久久久久久久久久久久久吹| 中文字幕在线观看网站| 国产精品中文字幕视频| 国产一区二区三区视频| 日韩无码第2页| 亚洲天堂男人天堂| 亚洲成人一区二区| 久久精品国产亚洲AV不卡| 国产精品视频一区不卡| 99精品在线| 上高县| 在线观看无码一区二区台湾| 一区二区三区无码视频免费福利| 国产av午夜精品福利| 国产人人人|